Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how many transformer

Answer Posted / rajesh

TRANSFORMERS HAVE TWO TYPES.- STEP UP TRANSFORMER & SECOND IS
STEP DOWN.THIS CLASSIFICATION IS ON THE BASIS OF CONSTRUCTION.

Is This Answer Correct ?    3 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why can we use cosine wave instead of sine in ac supply as both have same rms vale and ripple factor

2558


th how could we differentiate between armoured copper and armoured aluminium cable what is the basic application? why we prefer the armoured copper as compared to armoured aluminium.

1967


In the ACB breaker capacity is 2000Amp but this each phase taken 1250 But total beldibg load is 600amp or 700amp watt is the problem

1964


How to calculate the Efficiency of Chiller

3353


why the neutral line is not giving shock to us if we touch it ?

1781


List the characteristics of filter?

1072


my question is how to answer the question "you are from b.tech eee background and why do you want to go for banking

1338


list the advantages of RCCB over other circuit breakers?

1708


wat is the first thing dat is needed, 2 lay a cable in some area??

1859


Why in power plant projects we see DOL starting method used for motors upto 160 kW instead of star delta method

1845


Is there any relevant technique to produce power from light and heat energy of the sun simultaneosly from same rays of light?

1879


How to calculate MCB Breaking capacity.

1522


why the carbon brushes are broken in srim while the motor runningtime

1716


Dear All, I am new in construction company , my boss ask a question at time of interview , If we have 60MW generation and Single Power Transformer step-up we have. if CMR 50/60MVA , ONAN, ONAF respectively , is it sufficient or not ? for that much power to transfer,

1647


I WANT BHEL PREVIOUS QUESTION

2360