Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why transformer ratings in KVA not in KW?

Answer Posted / sakthivel

if any electrical apparatus rating are depend on power
factor, transformer rating (are permanent load we not fixed
or base load are we not fixed so we noted the rating of
transformer rating )is KVA vanthni@yahoo.com

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

State the formula for overall efficiency of thermal power station

2984


Why two phase welding machine is used instead of three phase welding machine.

1853


Two liquids hot and cold in two vessels are there and an metal bar acts as a conductor of heat between the two vessels. what happens then. what happens after 24 hrs?

2144


WHat is the general checks required for Dry type transformers

2023


What is the formula to calculate the rating of a three phase air circuit breaker

2270


what is the function of Moulded case circuit breaker, why it is called Moulded?

1500


hi frnds what is meant by harmonics & what is meant by third hormonics,where its will occur ?thank u

1960


In CTs tan delta point should be earthed , what is the reason behind it?

2965


How relay works, reverse relay, master relay, os relay, earth fault relay and what is its setting point

1718


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1739


what is the working principle of energy saver control panel. please give the complete calculation & theory.

2362


Grid fault level [KA]?

2554


what will happen if OLR CT in all phases are short circuted

2111


what are the applications of TIG welding

1612


WHY L-G FAULT IS MORE SEVERE IN TERMS OF RRRV?

3134