deshuttering time for RCC for DPC over the foundation.

Answer Posted / vignesh s

For beam and slab
side deshuttering-
1 Day, slab bottom-
10Days, beam
bottom- 14Days,
cantilever beam
bottom- 16 Days
above days will be
followed after
completing the rcc
slab.

Is This Answer Correct ?    11 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How you can turn off the display for dimension in CAD?

646


How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.

1794


What is the substitute of Mastic Asphalt?

6961


Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?

2601


wat would be the probable interview questions and GD topics for IOCL exam?

9241






What is passive earth pressure ?

728


hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft

1412


what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?

1638


what is right & short method of measurement of slab&beam

1647


Moisture content calculation for diff mix ratio's ??

1211


how many minimum admixtures are used in water froofing structures

1852


What is the Unit weight of coarse sand (F.M- 2.20) ?????

1428


what is mc arther pile?

1784


do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?

1214


What is a kip?

729