deshuttering time for RCC for DPC over the foundation.
Answer Posted / vignesh s
For beam and slab
side deshuttering-
1 Day, slab bottom-
10Days, beam
bottom- 14Days,
cantilever beam
bottom- 16 Days
above days will be
followed after
completing the rcc
slab.
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
rimmer in pile foundation
Moisture content calculation for diff mix ratio's ??
What are wooden shingles?
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
what is diversion?
what is the type of earthing
How you can turn off the display for dimension in CAD?
how much repeitation for conventional and maivan formwork?
what is Brest Wall?