deshuttering time for RCC for DPC over the foundation.
Answer Posted / vignesh s
For beam and slab
side deshuttering-
1 Day, slab bottom-
10Days, beam
bottom- 14Days,
cantilever beam
bottom- 16 Days
above days will be
followed after
completing the rcc
slab.
Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
How you can turn off the display for dimension in CAD?
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
What is the substitute of Mastic Asphalt?
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
wat would be the probable interview questions and GD topics for IOCL exam?
What is passive earth pressure ?
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
what is right & short method of measurement of slab&beam
Moisture content calculation for diff mix ratio's ??
how many minimum admixtures are used in water froofing structures
What is the Unit weight of coarse sand (F.M- 2.20) ?????
what is mc arther pile?
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
What is a kip?