Tell the details of the precommissioning tests that are
performed on distribution transformer, power cable and
switchgear (11kv).
Answer Posted / subaharan
first check the transformer bushings and their condition,then
you meggering the transformer each phase to phase and phase to
earth.
power cable you check the high voltage test which is used for
measuring the leakage current,meggering and continuity
checking.
switchgear the same meggering,isolator checking,relay
testing(set various values of currents,voltages and set time
for tripping) make the fault and note the trip time.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
please tell me, how i clear the objective test? when i studied form the one book after i solved the objective ,that time i solved that qes. but if i tried solve objective form the other book then i could not solved these que.
Explain Creepage Distance of Insulator
What is the estimated total hydropower potential of india?
I use 20 nos led tube 4feet, in pathway 100mtr approximate, so what size cable i use for lighting
HOE WE CAN IMPROOVE BY USE OF CAPACITOR
is there any role of power factor with frequency variation? and how we can manage the frequency variation?
we need a ntpc previous papers
Transformer how to maintaince a check b check c check d check
can we use CBCT in neutral of solidly grounded transformer? in place of three phases we can pass only one phase which decreases the size of CBCT?
what is effect of 5amp fuse on 2mva pry protection of transformer
Basic motor transformer generator
What is the role of feedback in a closed loop control system?
why we use single core 630mm2 cable for transformer secondary side
Define ampere
can anyone explain the star-delta motor control wiring ,which wire go where and how they operate?