Tell the details of the precommissioning tests that are
performed on distribution transformer, power cable and
switchgear (11kv).
Answer Posted / subaharan
first check the transformer bushings and their condition,then
you meggering the transformer each phase to phase and phase to
earth.
power cable you check the high voltage test which is used for
measuring the leakage current,meggering and continuity
checking.
switchgear the same meggering,isolator checking,relay
testing(set various values of currents,voltages and set time
for tripping) make the fault and note the trip time.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Parts of machine and their discription in details with suitable photo
define digital electronic
what is mean by D.O. in distribution line poles?
What is different between Circuit breaker and Isolater?
What does the term power factor shows?
magnetizer priciple
What is icu and ics in Acb and how many time icu or ics passes from breaker?
How to calculate approximate load loss of a distribution transformer by knowing %ge imp of transformer?
description about dry type transformers
how to carried out DAR test in 11 KV Alternator ?
Could Please Explain briefly. Why used stabilizing resistance series with High impedance bus differential protection relay.
How to calculate per unit impedance of transformer?
Why is remote backup preferred to local backup?
What are the advantages and disadvantages of short-pitched winding?
Which do you think is the most significant cause of energy loss in a factory?