how much quantity of cement and sand required for
construction of 10 cum brick work( Brick size
3"*4"*9"(Standard size ) an d for 10 cum construction of SSM
(Size stone masonary) with Cm 1:6 for both.
Answer Posted / jocky
mortar required for 10 cu.m brick work
Dry mortar = 30% of brick work = 3 cu.m
one part of cement=3cu.m/sum of proportion
(3/1+6)=0.428cu.m
cement required in bags...0.428/vol. of one bag of cement
(0.428/0.035) =12.23 bags ..take 13 bags of cement
sand = 0.428*6= 2.57 cu.m
| Is This Answer Correct ? | 24 Yes | 10 No |
Post New Answer View All Answers
which method is used in semi-rigid connection design??
Different sizes of Hollow blocks and its weight. Thanks.
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
Advantage of Aluminum form work in terms of activities can be skip and cost too
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
Time required for curing of wall tiles before fixing
what is modular brick and it size
What black man invented the clothes dryer?
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
how much to get of BRC lapping in full yield and half yield ?
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
How to calculate quantity of plum masonry in 1:3:7
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water