how much quantity of cement and sand required for
construction of 10 cum brick work( Brick size
3"*4"*9"(Standard size ) an d for 10 cum construction of SSM
(Size stone masonary) with Cm 1:6 for both.

Answer Posted / jocky

mortar required for 10 cu.m brick work

Dry mortar = 30% of brick work = 3 cu.m

one part of cement=3cu.m/sum of proportion

(3/1+6)=0.428cu.m

cement required in bags...0.428/vol. of one bag of cement

(0.428/0.035) =12.23 bags ..take 13 bags of cement

sand = 0.428*6= 2.57 cu.m

Is This Answer Correct ?    24 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?

1611


in the earthquqke the profile of water on dam is parabolic or not

1463


what is cement wastage percentage in NHAI ROAD WORKS

1444


what energized you to complete your course?

1890


how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?

1351






Which stone is best for wall construction Laterite Stone or Cement Blocks

1326


What is Gsb tollens ?

1542


a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer

2037


how is the reinforcement is distributed in triangular slab

1773


what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet

1163


What is the exception critarea of cube?

2003


whats is difference between anchorage length and development length

1385


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

1390


What is the Maximum %age of Steel in columns and beams ?

737


What is the difference between shear and tensile strength?

669