how much quantity of cement and sand required for
construction of 10 cum brick work( Brick size
3"*4"*9"(Standard size ) an d for 10 cum construction of SSM
(Size stone masonary) with Cm 1:6 for both.
Answer Posted / jocky
mortar required for 10 cu.m brick work
Dry mortar = 30% of brick work = 3 cu.m
one part of cement=3cu.m/sum of proportion
(3/1+6)=0.428cu.m
cement required in bags...0.428/vol. of one bag of cement
(0.428/0.035) =12.23 bags ..take 13 bags of cement
sand = 0.428*6= 2.57 cu.m
Is This Answer Correct ? | 24 Yes | 10 No |
Post New Answer View All Answers
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
in the earthquqke the profile of water on dam is parabolic or not
what is cement wastage percentage in NHAI ROAD WORKS
what energized you to complete your course?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
Which stone is best for wall construction Laterite Stone or Cement Blocks
What is Gsb tollens ?
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
how is the reinforcement is distributed in triangular slab
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
What is the exception critarea of cube?
whats is difference between anchorage length and development length
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
What is the Maximum %age of Steel in columns and beams ?
What is the difference between shear and tensile strength?