Method of findingthe dry ingredient quantity of 1 m3
concrete.
Answer Posted / vikrant
(1.51/addition of mix of grade)
| Is This Answer Correct ? | 10 Yes | 8 No |
Post New Answer View All Answers
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
How to calculate quanty of steel in four leg stirrups?
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
how to identify np3 pipe and np4 pipe
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
types of survey and levelling instrument ?
why the openings of sieves are square io size?
How can you distinguish between sorption, absorption and adsorption?
what is shuttering co efficient?
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
Explain what are the skills required to become an architect?
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
how do you stabilize a waterlogged area in road construction
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete