purpose of centrifugal pump casing wear ring and impeller
wear ring

Answer Posted / gautam

there is a small clearence maintained between impeller nd the casing, so that impeller can rotate freely.Now there is a small amount of liquid leaking from discharge side to suction side causing erosion of the parts near clearence,causing this clearence to increase. so casing wear rings are provided to minimize these clearence nd take up the erosive action of leakage fluid on itself rather than letting the impeller or casing to be eroded. Now as casing wear rings are cheap they can b replaced by new one if it has worn out enough.

Is This Answer Correct ?    11 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What does thermal diffusivity of metals signify.

647


what do you mean by volvo ?

1828


Name the grade of forged steel use for manufacturing of master connecting rod and why to prefer that grade.

1263


What is the meaning of less pumping in AC

1558


What is an expansion valve and its purpose?

1436






what is mean by boiling mechanism ?

1537


What do you mean by the term thread size?

615


State newton’s law of convection.

660


compare brayton and otto cycle

1853


I'm a Mechanical Engineer (2007 passed out) 77% distinction degree holder from anna university chennai, tamilnadu. presently working in a software company, i'm interested in getting my job with Indian Railways. Can any one help me in how to know the vaccancies and applying for RRB.

1688


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

1387


What is difference between ASME EN & IS related welding procedures(WPS/PQR/WPQ)

3493


What are the items to inspect after cylinder liner is pulled out

1678


What will be the cause of high temperature in one cylinder of D/E?

1522


what is first law of Thermodynamics ? What is second law of Thermodynamics ?

1533