Answer Posted / bhatt
MCC is motor control centre hence it must have back-up fuse
or back-up MCCB/MCB and starter whereas PDB is Pwer DB
which generally feed lighting and normal power load.
Is This Answer Correct ? | 14 Yes | 2 No |
Post New Answer View All Answers
How test for Ddo vector group test condition?
why we use sinosidal voltage / current instead of others in system?
what is charger supervision and control supervision?
why is control bus bi-directional?
As we know induction squirrel cage motor torque Directly praprortinal to applied voltage in star connection & delta also. If I connect 55KW Motor to DOL starter in load condition does motor withstand the load & what will be the current withdrawn ? motor will not fail ?
How to operate a ac chilar plant?
Why do we avoid electrical conduits in floors at apartments?
In constant power region of 3-phase IM torque-speed characteristics, if frequency increases slip A does not alter B decreases C increases D none of above
Define ampere
How can we find out LT UG cable fault (size,from-4*25mm sqr to 4*300mm sqr)? How mani types UG cable faults?
Dear sirs, pls check this 4-20ma to RS485 module datasheet,pls guve me some suggestions. http://www.szsunyuan.com/sy/pro_more.asp?Productid=539 Thanks. E-mail:yunianjiang99@gmail.com
how external lighting design? please give examples?
What is the distance between body earthing and neutral earthing.?
i have been tasked with a design of protection, metering and control(PMC) relay panel extension to accommodate all PMC relays.There is an already existing panel where this one will be built.What are the design aspects for this kind of project? thank you.
What is Tachometer used to measure?