How to calculate the cement, sand quantity for plastering?
(10'x10')10mm thick ratio 1:5. wht"s the formula?
Answer Posted / aijaz hussain, modi builders
Volume of Wet Mortar = 10 mm X 100 sft.
= 10/1000 X 100/10.76 = 0.093 cu.m.
Add 20% for depressions, joints and wastage
= 0.0186 + 0.093 = 0.112 cu.m.
Volume of Dry Mortar = 1.3 X 0.112 = 0.146 cu.m.= 5.154 cu.ft.
Cement required = 1/6 X 0.146 = 0.024 cu.m. = 0.7 Bag
Sand required = 5/6 X 0.146 = 0.122 cu.m. = 4.30 cu.ft.
| Is This Answer Correct ? | 117 Yes | 50 No |
Post New Answer View All Answers
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
how to preaper for interview wat they asked in interview give me idea
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
what is diffrence between catchment area,watershed and basin?
material used for mendrel use to bend epoxy coated rebar
what is civil enginnering & what you need of this course?
Define What is a kip?
Slump Values for works?
What is meant by a context menu in a cad software?
what is Short bored pile foundation.
how to convert sand in Cft to Kgs
what is tension footing?
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
HOw much % of premium on DSR-2013 currently
How many bricks are there in 100cft?