for 100sft of Cement plastering ratio 1:6 How much quantity
of cement and sand required.
Answer Posted / mohammed aijaz hussain
Let the thickness of Plastering be 12 mm.
Volume of Wet Mortar = 12mm X 100 sft.
= 12/ 1000 X 100/ 10.76
= 0.112 cu.m.
Add 20% for depressions, joints and wastage:
= 0.022 + 0112 = 0.134 cu.m.
Volume of Dry Mortar = 1.3 X 0.134 = 0.175 cu.m.
Cement required = 1/7 X 0.175 = 0.025 cu.m. = 0.71 Bag
Sand required = 6/7 X 0.175 = 0.15 cu.m.
| Is This Answer Correct ? | 41 Yes | 21 No |
Post New Answer View All Answers
What is Density of cement, sand & aggregate ?
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
how many material required for brickbat water proofing of toilets.
Time required for curing of wall tiles before fixing
How cracks in concrete can be avoided?
what is the percentage of silt in black cotton soil.?
Explain the difference between shear and tensile strength.
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
rate analysis for cement pointing 1:4 , for 100 sq m
What quantity of 1.0 m3 bricks required?
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
WHAT IS YOUR CURRENT SALARY
What is Architect-Prepared Contract?
In which code the the maximum height of concrete casting has been explained