Answer Posted / gaurav
Make "V" groove and then pre heating of the job is required
and proceed with welding. After welding RT is done and then
SR.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is iiucr in relation to petrol engine ?
i am looking for a 4 kw immersion water heater /in the USA is this a 220 system or 240
What is the jet plane?
what is the meaning of rheostat in maximum and minimum position?
What are the advantages of gear drive?
What causes hardness in steel ? How heat treatment alters properties of steel ?
hi guys ,pls help me......i urgently need previous year question paper for preparation of HPCL (MECHANICAL).pls email me @ mangal_2911@yahoo.co.in
Which has the greater pressure in a stern tube sealing seawater or L.O.
i m a 1st year student my senior asks me 2 give intro wht will a impressive answer
Why required store to Factory?
tell me about a time when u had to many things to do and u were required opinion prioritized your talks.
How can we calculate the per hour productivity of a hydraulic rock breaker,for excavator..
What are the different values that need to be determined in order to design a cylinder for an ice?
Causes of dilution of lubricating oil in a steam turbine?
Hello sir! I hav read the above discussions about PSU.I hav 72% aggregate in Mechanical bt i do had a back in 1 subject,so m i too eligible for PSU?