if we want to increase the back up time of an UPS what
should we do ?
if we want to decrease the charging time of a
battery/batteries attached with the UPS what should we do ?
Answer Posted / manoj
Ups- back can be increase by increasing the AH capacity of
battery or by increasing no. of battery unit.
Before doing so we need to syncronise it with Battery
charger/Rectifier.
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
What is the effect of atmospheric pressure & Temp; on efficiency of motor? Why NGR(Neutral Grounding Resistor) is used in 132/11 KV Transformer & how? What is the use of Auto T/F in Grid Station?
PLEASE INFORM ABOUT THE IDEAL TEST RESULTS OF MAGNETIC BALANCE TEST OF TRANSFORMER 33/11 kv DELTA-STAR T/F
How can we increase the capacity of Energy.?
why they were using TRIAC instead relay in some controllers and what is the advantages.
Application Comparison between 22KV (UE)and 33KV (E) system. Are we allowed to use 33KV (E) cable in lieu of 22KV (UE) cable. What are the technical disadvantages.
What are the roles and responsibilities of electrical engineer in cement plant
why burdens of VTs is more than CTs?
how does grading rings & spacers in transmission line works? Working Principle?
How to calculate the Efficiency of Chiller
The advantages of Magnetic flux leakage technique over Ultrasonic technique for non distructive testing of material.
if i am in front of transmission line how to know that current direction without any equipment
what is LSR?
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
pls tell me about ups internal connection & we have given only 3 phase supply to ups system how get 4 wire (R Y B N )
When and where resistance earthing is used ? How to calculate the time constant for earth fault