Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

A planet gear with 25 teeth is meshed with a sun gear of
100 teeth.
Both are connected using a arm. How many rotations are
needed for planet
gear to complete one rotation around the sun gear?

Answer Posted / siddu

4 rotation,

Is This Answer Correct ?    8 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

1808


Dear friends, i am a student of mechanical final year in rajasthan. If you have any type (Technical,interview, aptitude) of question paper related to BIRLA CEMENT LTD. than plz send me these paper at vinodsainikumar4@gmail.com thanks

2042


What is a turboprop engine?

1221


what is pulverisation

20776


what is difference between dry and flooded type chiller?

2400


Is it a good sign when thick smoke comes out of a Oil vapor extraction fan of a steam turbine oil sump? What does it indicates?

931


i am preparing for vsp management trainee technical 2010.can any one send me modelpapers of preliminary written test.

1945


What do you analyze from boiler water analysis?

2056


What is usage of rotameter and hydrometer.

1474


Enumerate the parts of Main Switchboard

2007


How will you classify sliding contact?

1084


What was the hardest class in engineering you had to take?

999


How much should be the minimum and maximum suction and discharge pressure of screw chiller plant.

2780


What should you do before you start the engine?

2174


How can one estimate the flow from a centrifugal pump after an accident where the pipe attached to the pump discharge breaks? Extrapolate the characteristic pump curve to H=0?

1854