what is difference between migration project and integration
project? can anyone explain with the example
Thanks in advance
Answer Posted / d anil babu
integration project means two projects integrate to a single
project for one purpose
migration project means project already developed by one etl
tool.we take that project and develop that project with
another tool for same purpose
ex:informatica to datastage
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
Can you filter data in hashed file?
Distinguish between informatica & datastage. Which one would you choose and why?
What steps should be taken to improve Datastage jobs?
Difference between data warehousing and olap?
What is the differentiate between data file and descriptor file?
How you Implemented SCD Type 1 & Type 2 in your project?
Define data aggregation?
AGGREGATOR default datatype
How complex jobs are implemented in datstage to improve performance?
Define ds designer?
Define project in datastage?
Difference between ‘validated ok’ and ‘compiled’ in data stage?
How to reverse the string using unix?
What is a datastage job?
i WANTED TO USE THE RANGE LOOKUP SCENARIO IN DATASTAGE 7.5.2 SRVER JOB.i HAVE A DATE FIELD IN SOURCE AND I SHOULD MATCH IT WITH A FIELD IN LOOKUP FILE.BUT,THE FIELDS SHOULD MATCH EVEN THOUGH THERE IS SOME RANGE.CAN SOMEONE TELL ME HOW CAN I DO THAT. THANKS