what is difference between migration project and integration
project? can anyone explain with the example
Thanks in advance
Answer Posted / d anil babu
integration project means two projects integrate to a single
project for one purpose
migration project means project already developed by one etl
tool.we take that project and develop that project with
another tool for same purpose
ex:informatica to datastage
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
What is the difference between server job and parallel jobs?
why do u need the IOS upgradation in a FC switch
create a job that splits the data in the Jobs.txt file into
four output files. You will direct the data to the
different output files using constraints. • Job name:
JobLevels
• Source file: Jobs.txt
• Target file 1: LowLevelJobs.txt
− min_lvl between 0 and 25 inclusive.
− Same column types and headings as Jobs.txt.
− Include column names in the first line of the output file.
− Job description column should be preceded by the
string “Job
Title:” and embedded within square brackets. For example, if
the job description is “Designer”, the derived value
is: “Job
Title: [Designer]”.
• Target file 2: MidLevelJobs.txt
− min_lvl between 26 and 100 inclusive.
− Same format and derivations as Target file 1.
• Target file 3: HighLevelJobs.txt
− min_lvl between 101 and 500 inclusive.
− Same format and derivations as Target file 1.
• Rejects file: JobRejects.txt
− min_lvl is out of range, i.e., below 0 or above 500.
− This file has only two columns: job_id and reject_desc.
− reject_desc is a variable-length text field, maximum
length
100. It should contain a string of the form: “Level out of
range:
what is 'reconsideration error' and how can i respond to this error and how to debug this
What is difference between symmetric multiprocessing and massive parallel processing?
How will you move hashed file from one location to another location?
How do y read Sequential file from job control?
To see hidden files in LINIX?
Describe stream connector?
I/p : F1 table have A,B,C,D,E and F2 table having C,E,V i need output 0utput1: ABD output2: V any one suggest me this
Does datastage support slowly changing dimensions ?
hi.... am facing typical problem in every interview " I need some critical scenarios faced in real time" plz help me guys
What is active and passive stage?
What is datastage engine?
How do you register plug-ins?