Describe the basis on which alarms should be generated and how
their associated priority is determined

Answer Posted / vinod hepat

Alarm should be generated for all the values which distrub
you process & alarm should be set at such a value that
operator get time to take corrective action.

alarm which hamper ur process,safety or equipment badly
should be given high priority.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can anybody tell me which type of question are asked in the interview for the FORMULATION(Pharma) as a instrumentation engineer, & question in building managment system.

1600


I need to know steps to Calibration Valve Guard......

1001


Draw a group of instruments interlocked to a Pump & Motor?

666


sir,would you please send me the Hindustan petroleum corporation limited papers(HPCL).my e-mail ID is ujjwal_sharma1983@yahoo.com

1831


What is three element drum level control system why its better than single element?

2077






If a control valve is hunting means means if we are giving 50% to the cv, the cv will open at 51% then slowly slwoly it will reaches 49% , so what to do for solve this problem. The cv is double acting and mounted for anti surge operation, it having 4 nos. volume booster, one sov, one positioner, etc..?

1648


How works weighfeeders in cement industry? what is the working principle?

1538


hi sir yhis is zahid ali i am preparing for the jspl at oct.4.please send me the recently updated sample paper.

1706


where proximity sensor installed on tank in loading arm application

1538


key exchanges in wpa,wpa2,tls

1516


what are the documents(Construction point of view for a process plant) submitted by contactor initially entering in to new site for client?

1768


Which type of pressure can be measured by these elements?

641


Can anyone send most commonly asked interview question in Oil & Gas industry

1776


OBJECTIVE TYPE QUESTIONS OF ANALYTICAL INSTRUMENTATION

10307


Describe a time when you anticipated potential problems and developed preventive measures.

2494