How do we calculate the building footing calculation ?
Answer Posted / imtiyaz
H/3 (A1+ A2)+SQRT (A1*A2)
| Is This Answer Correct ? | 10 Yes | 4 No |
Post New Answer View All Answers
In a concrete grade C35A, C & A stands for what and equalent cube strength?
What does civil status mean?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
how do you stabilize a waterlogged area in road construction
What are the ingredients of pre-stressed concrete?
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
How much material will consume for following specification water tank (9*7.5*6 feet)?
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
how many material required for brickbat water proofing of toilets.
what are the ffactors you considered choosing the course?