pl.may i place dry mix in casting of drain bed partialy filled
with water?if no pl explain.
Answer Posted / ram narendranath
Don't pour the concrete in partially filled drains because of there will be more water than the requirement for concrete in that case cement will may be drained out also. It is necessary to remove maximum possible water after wards fill the damp area with Coarse sand after wards you have to pour the concrete for Drain bed. Otherwise cement is to be add to water to maintain the cement quantity in concrete as per requirement.
Narendra
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
List out the potential risk factors for workers on the construction site?
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
How can explode a block?
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
what is the maximum number of course that can be laid according to IS code and the max height.
how to conversation of all construction material in to brass
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
How much is the cover for slab?
How you can turn off the display for dimension in CAD?
what is education Cess.
How to find the cuplock pipe qty in staging for Minor bridge?
Minimum and maximum size of the building components
Define What is the distance between railway tracks?
How can we convert weight batch to volume batch for m30 mix
PL.tell me about civil engineering questions with answer