pl.may i place dry mix in casting of drain bed partialy filled
with water?if no pl explain.

Answer Posted / ram narendranath

Don't pour the concrete in partially filled drains because of there will be more water than the requirement for concrete in that case cement will may be drained out also. It is necessary to remove maximum possible water after wards fill the damp area with Coarse sand after wards you have to pour the concrete for Drain bed. Otherwise cement is to be add to water to maintain the cement quantity in concrete as per requirement.

Narendra

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

roll of DLC in road constructions

1419


what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?

1783


How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????

1545


what is work of planning deptt. in any construction compny (in road project)

1889


How is make concrete cube?

711






What is quantity of cement and sand required for 2000sqft of tiling?

2399


States some of the commonly used commands in cad software’s?

771


Explain creep?

695


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

2622


How many types bend used in civil reinforcing

2786


Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?

1385


What are the different types of foundation?

733


indian standard split spoon sampler

1558


how to calibrate the RM 800

1859


What is the density of most of construction materials?

736