pl.may i place dry mix in casting of drain bed partialy filled
with water?if no pl explain.
Answer Posted / ram narendranath
Don't pour the concrete in partially filled drains because of there will be more water than the requirement for concrete in that case cement will may be drained out also. It is necessary to remove maximum possible water after wards fill the damp area with Coarse sand after wards you have to pour the concrete for Drain bed. Otherwise cement is to be add to water to maintain the cement quantity in concrete as per requirement.
Narendra
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
What is the purpose of the gap in the road on this bridge?
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
why are you joining in this (applied post) job and your aim for this job
Name the main components of a cad gui?
What are advancements in civil engineering?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
How you can use different dimension tools in cad? What are the different dimensions available?
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
Describe a time when you anticipated potential problems and developed Preventive measures
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.
What is difference between code and standard and specification?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''