How to calculate the amount of cement & sand required for
plastering work with ratio 1:4 please give me an answer with
detailed step.
Answer Posted / matrix civil & structural
THE METHOD GIVEN BY Mr.BASU IS SEEMS TO BE APPROPRIATE TO ESTIMATE THE QUANTITY OF CEMENT AND SAND IN PLASTERING.
Is This Answer Correct ? | 66 Yes | 21 No |
Post New Answer View All Answers
how to calculate the density for high density concrete ? or is it same as the density of RC?
How did the romans get water up hills using aqua ducts?
how water proof chemicals act in concrete to avoid leek?
How to take labor charges for construction of 1cum of concrete?
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
States some of the commonly used commands in cad software’s?
how to identify np3 pipe and np4 pipe
What is portland cement
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
How is calculate the cube molt
explain what do you mean by the property development.
In which code the the maximum height of concrete casting has been explained
How to calculate quanty of steel in four leg stirrups?
What is meaning of FREE STANDING STAIRCASE ?