How to calculate the amount of cement & sand required for
plastering work with ratio 1:4 please give me an answer with
detailed step.
Answer Posted / matrix civil & structural
THE METHOD GIVEN BY Mr.BASU IS SEEMS TO BE APPROPRIATE TO ESTIMATE THE QUANTITY OF CEMENT AND SAND IN PLASTERING.
| Is This Answer Correct ? | 66 Yes | 21 No |
Post New Answer View All Answers
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
calculate the quantity of water for 1:6 cement mortar
how many BSCs can i connect to the HUAWEI MSC
what is right & short method of measurement of slab&beam
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
on what basis the partial factor of safety are decided? form the load combinations
.5Ast
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
Will water damage concrete?
what is shuttering co efficient?
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
What is fineness modulus ? and its sieve # ?
How to make a c++ program that converts any base to base 10?
How much quantity of rod binding work by a rod binder per day