How to calculate the amount of cement & sand required for
plastering work with ratio 1:4 please give me an answer with
detailed step.
Answer Posted / matrix civil & structural
THE METHOD GIVEN BY Mr.BASU IS SEEMS TO BE APPROPRIATE TO ESTIMATE THE QUANTITY OF CEMENT AND SAND IN PLASTERING.
| Is This Answer Correct ? | 66 Yes | 21 No |
Post New Answer View All Answers
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
Describe Briefly The Various Methods Of Concrete Curing?
density of crush sand & crush stone or grit powder
why does the most of civil engg is not intersted to going for teaching field?
What is the difference between built area and super built up area?
why the profile of shell of natural draught cooling tower is hyperabolic.
can i get hindi version of is codes based on civil engineering?
What are the responsibilities of a construction manager?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
In jack arch floor, the rise is kept?
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
in plate load test what is the thickness of plate 20mm 5mm 50mm none
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
what is relation between SPT N value and driving piles after conducting a soil test?