Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

pl.may i place dry mix in casting of drain bed partialy filled
with water?if no pl explain.

Answer Posted / artic

If you are not adding water cement will not react and you
will not get any strength. So you have to add water as low
as possible(0.3)

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the ideal size of the living room ranges from small to large size?

1098


in the earthquqke the profile of water on dam is parabolic or not

1927


For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?

1931


Define absolute co-ordinates?

1258


How to testing voids of filled aggregate in bitumen mix design

1876


I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?

2541


For making a new road in a village having a school & hospital , tell the steps of construction systemically ?

1623


explain the rale of the government in the construction industry

2355


What is the use of offset command?

1111


Formula for calculation volume of essentric footing

1788


how much tempareture are required to make liquid state of pid leed

2189


how to workable concrete cube test M-25 design mix

3433


What will you do if you encounter problems like accidents?

970


What is thumb rule for deep trench excavation

1773


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

2095