We have a 33/11kv switchyard having 12.5 MVA power
transformer. We export & import power through this
transformer. When we export power, the PF will be depend on
GRID PF & when we import power the PF will be depend on our
load PF. but the problem is that,when neither we export nor
import but our 33KV vCB is in close position,our meter read
the power factor 0.14 to 0.25 at that moment. So how can be
we improve the power factor at that moment.
Answer Posted / ab. khalil khan
are load variation in your plant? If variation for some minutes are in your plant then this problem should be created. In load time power factor was normal but on no load time power factor was abnormal, because we have maintain the power factor in on load position.At no load time capacitive power has make a leading power factor.for detail pl. cont. to Ab. Khalil 9977278622
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What are the commonly used schemes for the bus zone protection?
A 50Hz,4-pole,3-phase,star-connected synchronous motor has a synchronous reactance of 12ohmsper phase and negligible armature resistances.the excitation is such as to give an open-circuit voltage of 13.2kilovolt.the motor is connected to 115kilovolt, 50hertz supplying. what maximum load can be the motor torque,line current and power factor?
How to calculate the Efficiency of Chiller
any one can explain what is the size of pvc,armoured, various sizes of powr cable dia?
what is the ms flat constant for calculating earth mat design calculation?
How we can calculate the life of Lead acid battery
What will be electrical cost per sqft for IT building (basebuild and fitout)and for residential township?
my question is how to answer the question "you are from b.tech eee background and why do you want to go for banking
how current is reverse from its normal direction during the fault?
Which Class insulation is prefered for the sandwich Busducts ? Why?
how we decide the require size is this for a known current at fuu load?
Define branch?
if an insulated power and control cables of a running gas diesel gensets laid direct in an open trench i.e, trench bed is not rcc of a power house in which rain water, spillage water alwas exists and all power control cables remains submerged even when gas gensets of 480 kw each runningin on load. These power &control cables runs from power house to switchgear room through these trenches in which water remains most of the time. pl explain its merit & de-merit
How Can You Relate Power Engineering With Electrical Engineering?
what is the difference between earthing and unearth