how to calculate concrete qty for footing using M25 grade
1:1:2 for 731 cft.
Answer Posted / chetan patel
for 1 cmt cont.of 1:1:2
cement:1.52/4=0.38/.035=10.8
Sand :0.38 cmt
Agg :0.38*2=0.76 cmt
So for 731/35.31=20.70 cmt
C :20.70*10.8=224 bag
S :20.70*0.38=7.86 cmt
A :20.70*0.76=15.73 cmt
| Is This Answer Correct ? | 8 Yes | 4 No |
Post New Answer View All Answers
what is modular brick and it size
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
pls give me ans to ACT formula cube testing porpuse
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
on what basis the partial factor of safety are decided? form the load combinations
what is education Cess.
in design case of structural member best suitrable percentage of steel limit is what
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
What is the use of extruded feature in solidsworks?
what is relation between SPT N value and driving piles after conducting a soil test?
what is mc arther pile?
what is tension column?
how much of the strength comes from post-production curing