Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate sand, cement quantity for plastering (1:5)? what"s the formula?

Answer Posted / sandeep tv

let Area to be plastered=100 m^2
& Thickness of plaster= 12mm=(12/1000)m= 0.012m
Volume of mortar required= 100 x 0.012= 1.20 m^3
Add 20% extra mortar for filling joint,depressions and
wastage.

Volume of the mortar= [0.20 X 1.20]+ 1.20=1.44 m^3
[Wet Volume]

Increase further by One-third of the volume to get Dry
volume
Quantity becomes= [(1/3) X 1.44]+ 1.44=1.92 m^3

Summation of proportion=1+5=6
For 12mm plastering in 1:5 cement:sand mortar mix,

1)Cement required= 1.92/6= 0.32 cu. m
No. of bags of cement= 0.320/0.0347=9.22 bags
>>9 bags(say)
Kgs of cement required=9 x 50= 450 kg (approx)

2)Sand required= [1.92 x (5/6)]= 1.60 cu. m


[Weight of 1 bag of cement= 50 kg
Cement should be always measured by weight to avoid
variation.

One 50 kg bag of cement weighs 1440 kg/cu. m
Volume of 1 bag of cement= 50/1440=0.0347 cu. m ]

Therefore to convert Cu. m into No of bags of 50 kg
cement,just divide the volume of cement by 0.0347

Is This Answer Correct ?    60 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate number of bitumen for road asphalt

1598


How do we test on design and style in a software?

1213


a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing

3309


1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.

2355


What are the advantages of cad?

1143


How to do base isolation using ETABS software?

3014


Types of column foundation and how to calculate its steel quantity.

2005


how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?

2030


How to calculate sand , cement quantity for 23mm thk brick work(10x10)

5256


660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need

1683


How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit

6605


Why are steel plates inserted inside bearings in elastomeric bearings?

1220


For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.

2146


What glue is least sticky?

1297


what is Short bored pile foundation.

2804