How do you derive the quantity of cement & sand in brick work
construction in 1Meter cube, using CM 1:6 and bricks of size
19*9*9 cm
Answer Posted / saif raza
1# Brick required :- 650 nos
2# Cement :- 1.23 bags
3# Sand :- 0.25 cum
| Is This Answer Correct ? | 4 Yes | 8 No |
Post New Answer View All Answers
Describe a time when you anticipated potential problems and developed Preventive measures
What will you do if you encounter problems like accidents?
how to disign cuplock shuttering and it's matireal requirement snd any related web site
material used for mendrel use to bend epoxy coated rebar
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
How do you calculate the power of centrifugal pump?
how to determine H- zone in a column? where it will occur?
please briefly explain calculating or estimating steel quantity for a RCC column?
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
where i can get material costs on weekly basis
Define What is an ice dam sock?
what is the basic difference between Coloumn & Shear Wall
what is meant by residual strain?
trapozidal
what is directivity effect?