How do you derive the quantity of cement & sand in brick work
construction in 1Meter cube, using CM 1:6 and bricks of size
19*9*9 cm
Answer Posted / saif raza
1# Brick required :- 650 nos
2# Cement :- 1.23 bags
3# Sand :- 0.25 cum
| Is This Answer Correct ? | 4 Yes | 8 No |
Post New Answer View All Answers
what"s the sort of beams?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
What are the advantages of cad?
how to find ssm in foundation?
How is calculate the cube molt
what will be price of 1:2:4pcc per kg?
types of piles detail,
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What is bylayer?
how to convert sand in Cft to Kgs
Describe the advantages and disadvantages of using plastic and timber fenders?
In jack arch floor, the rise is kept?
Define What materials were used to build the Golden Gate Bridge?