how to calculate concrete qty for footing using M25 grade
1:1:2 for 731 cft.
Answer Posted / sumanth
we can only calculate the quantity in m3 only after that we
can converet in c.ft.
1/4 x 1.54 x 28.8= 11.08 bags cement for 1 m3 for the ratio
of 1:1:2
s0 731 cft = 20.719 m3 * 11.08 = 229.570 bags cement used
1/4 x 1.54 = .385 m3 sand for 1 m3
so 20.719 m3 x .385 = 7.976 m3 sand required in 731 cu .ft
2/4 x 1.54 = 0.77 m3 chips ( aggregate ) for 1 m3
so 20.719 m3 x 0.77 = 15.953 m3 chips required in 731 cu .ft
| Is This Answer Correct ? | 15 Yes | 10 No |
Post New Answer View All Answers
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
Specific gravity of cement?
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
What are the advantages of cad software?
What is the largest concrete dam in the world?
which type of instrument included in plumbing work?name of instrument?
What are the different approaches in designing the floors of the service reservoirs?
How can i do RCC rate analysis?
types of laps in column
What is difference between combin footing & rapt footing
why top layer of block work shoud be full size if any cut block adjustable than another layer?
what pressure the NP2 class RCC pipe can sustain?
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
I need old MMUP exam question and answer for Civil engineering