Any body please let me know how to prepare Method Statement
for Bored Cast in situ piles.
Answer Posted / siaf rizvi
Above all,
1# Sample of rock @ termination level.
and mant more which u can learn as per exprience.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
what are the Task work of different labour.?
What is the zero value in quantity surveying
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
how to calculate valuation for the old building?
What is oneside mat. And explainÂ
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
What are the different softwares used for cad?
what is labour consume factor in residential projects
what is the effect of duration of earth quake on framed structures ?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?