Where the ON LOAD TAP CHANGER is provided in the setp up
transformer?
Answer Posted / anand yadav
In most cases, on load tap changer is provided at higher
voltage & lower current side.It is economical.
| Is This Answer Correct ? | 10 Yes | 2 No |
Post New Answer View All Answers
When calculating the speed of a rotor required for a particular frequency of synchronous generator we use the equation 60f/p Is this p is the number of pole pairs of rotor & do we consider the number of pole pairs in the stator is 1?
which model T or pie model is prefarable in power syatem
what is the min and max ohmic resistance for the earthing rod installed for lighting poles for street light network
how invertor convert the dc into ac give brif detail
what is the necessary of using inductance property in transmission lines even through resistance is used to opposes the high current flows in that?????
what is Different between Bilinear and Unilenier?
Define liftable weight of a transformer? Does the total weight of transformer include oil weight?
What are the two basic types of transformers?
What is the permissible limit of shaft voltage for 6.6 KV motors ? Why? Is there any standard is available?
How to calculate pitch, gauge of winding wire, and No. of turns for 30HP, 3 phase, 4 poles 50Hz, 380V induction motors
What is the rating of a circuit breaker needed for 300 kv load in 33KV supply line of 33/415 transformer ? Whether 800/1200 amp vaccum circuit breaker can perform for a 33 KV line in input in 415 volt in output of the transformer ?
What is the need of earthing transformer for delta side of a transformer. (Think of a line section between a star/delta transformer at a grid substation and delta/star transformer at a village. An earthing transformer is there at the delta side of the star/delta transformer at grid substation). As there are no ground reference there will not be fault current if a one phase is grounded. Further L-L phase will be sensed by the primary side of star/delta transformer as a L-G fault. So why an earthing transformer is required at delta side
why we not used 11kva as a direct our electrnics component.
what is destructive and non-destructive testing of welding
which metal is use in shunt