how to calculate concrete qty for footing using M25 grade
1:1:2 for 731 cft.

Answer Posted / dharmesh patel

we can only calculate the quantity in m3 only after that we
can converet in c.ft.
1/4 x 1.54 x 28.8= 11.08 bags cement for 1 m3 for the ratio
of 1:1:2
s0 731 cft = 20.719 m3 * 11.08 = 229.570 bags cement used
1/4 x 1.54 = .385 m3 sand for 1 m3
so 20.719 m3 x .385 = 7.976 m3 sand required in 731 sq .ft
2/4 x 1.54 = 0.77 m3 chips ( aggregate ) for 1 m3
so 20.719 m3 x 0.77 = 15.953 m3 chips required in 731 sq .ft

Is This Answer Correct ?    41 Yes 18 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is tension column?

1560


why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure

1202


What do you mean by bond? What are the different types of bonds?

1662


Spider cracks occur in beam bottom due to––

1658


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?

1867






What is the snap size in civil and how can we create it?

2311


What is the crank length in the slab?

636


Define What is passive earth pressure ?

699


Explain what are the skills required to become an architect?

709


What is Curtailing of R/F

1988


What is the software used in civil engineering?

665


How to do base isolation using ETABS software?

2493


Are cruise ships built for the transatlantic run?

765


how do we design mix ratio?

1429


How will you Engage Labours on Site?

1416