how to calculate concrete qty for footing using M25 grade
1:1:2 for 731 cft.
Answer Posted / dharmesh patel
we can only calculate the quantity in m3 only after that we
can converet in c.ft.
1/4 x 1.54 x 28.8= 11.08 bags cement for 1 m3 for the ratio
of 1:1:2
s0 731 cft = 20.719 m3 * 11.08 = 229.570 bags cement used
1/4 x 1.54 = .385 m3 sand for 1 m3
so 20.719 m3 x .385 = 7.976 m3 sand required in 731 sq .ft
2/4 x 1.54 = 0.77 m3 chips ( aggregate ) for 1 m3
so 20.719 m3 x 0.77 = 15.953 m3 chips required in 731 sq .ft
Is This Answer Correct ? | 41 Yes | 18 No |
Post New Answer View All Answers
what is tension column?
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
What do you mean by bond? What are the different types of bonds?
Spider cracks occur in beam bottom due to––
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
What is the snap size in civil and how can we create it?
What is the crank length in the slab?
Define What is passive earth pressure ?
Explain what are the skills required to become an architect?
What is Curtailing of R/F
What is the software used in civil engineering?
How to do base isolation using ETABS software?
Are cruise ships built for the transatlantic run?
how do we design mix ratio?
How will you Engage Labours on Site?