Answer Posted / ratnakar
we step up the voltage for reducing the losses,step down
level of voltages depending on applications&line length b/w
sub station to load centers.we can directly step down the
voltage from 33kv to 433v in various industrial applications
| Is This Answer Correct ? | 11 Yes | 5 No |
Post New Answer View All Answers
List of equipments required foe industrial repair lab.
How to apply 'c' license and also explain what is difference between 'c' and 'b'license.i am also working in one of the private company.i have finished my diploma in 2014 .i have already finished in ITI electrician course.....
How 3 phase invertor works?
what is earth resistance? how to measured? and give values at power station and mcc area?
what is W.T?specify the acceptable range?
HOW TO CALCULATE THE HEAT AND LOAD OF LT-SUBSTATION WHICH CONTAINS 2*1MVA TRANSFORMERS,LT-SWITCH BOARD,MLDB,ACB,BUSBAR,ETC,......?
Match the following a)(X'+Y') b)X'Y' C)XY 1)NAND 2)NOR 3)Carry
1.what is the funtion of chiller primary & scondary pumps. 2.what is the use of distribution lines & Types. 3.what is the use the thermal power stations & how much capacity.
what will be project cost for 100 kv transformer connection under oyt scheme.
what do you mean by plant earthing system.
what & how to check the lightning arrester
Whether amorphous core transformer is available in India?.If available then up to what rating of voltage and KVA?.
We have two APFC panels in same station. I need how to connect CT in two APFC panels.can we take one CT in series connection or two separate CTs.
what are types of encoder
how to deside the capacity of chock for drive?