explain impact of tariff on energy management..? and what
is ABT tariff
Answer Posted / xyz
availability based tariff as clear from the name it is
basically a system which provides communication between
load dispatch LD and generation centre that may be any
power plant in this gen. comp. has to give information
about its precommitment for generation and it will be paid
accordingly and if followed penalty too wiill be given that
means this system will enforce better frequency of supply
and load schedule can be changed before a grace period of
approx. 2hrs.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the series parallel connection of capacitors? and how can we use these application in three phase motors for controlling torque?
i need previous entrence exam papers of nhpc.
Why do we require transformer with less specific weight if supply frequency is increased?
how braking & making capacity of circuit breaker is calculated?
what is the use of current transformer in power transformer secondary side.?its connectyed in WTI
i have applied for junior engineer 2 c&w for Guwahati RRB please send me last five year question paper
sent to a site and asked to explain how you would like a twenty seven flour building should be supplied with lighting and sockets plus a water boiler.
We have given to 3phase supply to ups system & how can coming netural
Explain different types of d.c motors? Give their applications
How many types of instrument cables are there?
how to calculate the torque of a motor?
There are different classes of protections in power plants.class a,b,c are clear..is there any class d and e r there..and elaborate class b protection.
How to calculate the phase to phase clearness of HT /// LT bus bar?????
I want d.g.set our company
what is the formula for calculating the phase clerance between two phases and phase to earth how to calculate the cable for a motor