Answer Posted / j.karthik
Mr.k.Prakashchandra can you able send the IE Rules soft copy
for my mail i.d: karthikdote@rediffmail.com....
My Point of view the
LT Voltage ranges are -- 230volt , 433volt.(less than 433volt)
Medium Voltage(MV) ranges are -- 3.3kV,6.6kV
High Voltage(HT) ranges are -- 11kV,33kV
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
Explain how you intend to work under pressure to meet up with deadline target?
please forward me the type of questions which would rise while me attending to 33KV Electrical License to my mail ID:vadrevu_raghava@yahoo.co.in
detailed procedure how we calculate cost for pcc m10 and rcc m20 including centering and labour excluding steel/ iron
what is the criterion for selecting vector group of Transformers ? i mean how to decide vector group of Generator transformer, substation trasformer and transformer at consumer end
Distinguish between nuclear power station with thermal power station for initial cost, starting period, cleanliness, and transportation of fuel
is it possible for different brand of H.V transformers to run or operate in parallel to each other? if so how much disturbance can this affact the H.V bus bar?
what is maxemo work permit procedure
How i can calculate current of cable according to ares?
Is there possible to Test Transformer for Overfluxing Capability. Or is there any firm who does Overfluxing Test on Transformer?
What is the difference between line drop and percentage line drop?
what about electrical pannel.? What is meant by plc pannel.?
Between educational qualification and practical work experience, give us a brief explanation on your practical experience in your past Endeavour that you performed well to the satisfaction of your past or present employer?
how much GROUND & NEUTRAL VOLT maintain in data center.
What products have you designed which have entered high volume production?
How we calculate the current carrying capacity of H.T. cabel?