Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Can I use measuring current transformers in protection
purposes?

Answer Posted / j.karthik(cce)

Mr.Ramesh kumar said answer is very correct..

We cannot use the Measuring C.T. for the protection
purpose.and we also cannot use the protection C.T. for
Measuring purpose.

Protection C.T Classes are:
CL 5P20
CL 5P10
CL PS

Measuring C.T Classes are:
CL 0.2
CL 0.5
CL 1.0

Generally the Measuring C.T's and Protection C.T's are
differentiate by using the C.T Classes..

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

hi this is hema can anyone mail me previous years questions for the APPSC-A.E.E (in electrical stream.) ......thank u.

1923


sir plz send some previous year questions of jspl.

1936


The specific heats of the gas at constant pressure and constant volume are respectively 1.0 kJ/kg K and 0.72 kJ/kg K; the value of R for the gas is

1137


how to compute kAIC?  with formulas...

4242


How can we findout the maximum efficiancy of Transformer? At which load?

2083


what are the parameters plays a major role in Potential transformer Burden calculation??

2197


what is the condition for YnD11

2556


What is the use of mc( moving coil) in dc voltmeter and dc ammter and what is the use of ( moving iron)in ac voltmeter nd ac ammeter

2891


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1795


What is mean 2XWY

2494


what is the relation between size of the anteena and wavelenghth of radiated wave

2178


A low wet bulb temperature indicates

1160


WHAT IS SPEC OF CLEANROOM MOTOR AND LIGHT FITTINGS?

2313


why do we put a transformer on soak before loading it

1143


what is the reason for indication of light in the earth lamps of main switchboard.if there is an earth why does one lamp get dim and the other two bright.

2346