Answer Posted / rohit garg
For a power plant Maximum Demand is a important factor for
deciding its billing and the requirement of power from the
electricity board. It is defined as the peak demand of
power whenever the maximum load is there in operation or in
running process in the plant for the particular time period.
Maximum Demand is used to decide contract demand too and it
is generally kept at 75-80% of contract demand. If demand
of plant exceeds maximum demand limit at any time there
will be penalty for that.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
What is primary and backup protection?
What will happen if we on 200kvr capacitor bank(11kv in bus)If there is low load on transformer (1.5 mva 33/11 kv)
How to calculate the volumetric capacity of a oxygen & Nitrogen gas Cylinder if pressure is 145 kg/cm2 & water capacity of cylinder is 67 liters.
I WANT HOW CALCULATE TO CABLE FOR WELDING PLANT ?
What is routh hurwitz stability criterion?
USE OF 8 WAY PAN ASSEMBLY
Role of active and reactive Power sharing in between two synchronized Generators, Droop Setting role ?
Why dry type cast resin transformers tap link blast in HV side while power shut down times on load?
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
What are the material used for resistor?
What will be the current drawn by HT motor, if low voltage is applied.. any formula to calculate the LT amps of HT motor.?
ACB & VCB how do work and saftes and how can maintenance in this and parts name show with picture
What is lc oscillator?
what is the sludge current
Can you tell me more about pu systems (per unit systems )calculation in large power systems? how to get the base for voltage and power in generator, transformator and transmission lines?