Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how much cement,sand,aggregate will use for 1 cum in ratio of
1:2:4.

Answer Posted / a.mohammed yahya

For all Common Grade of Concrete Quantity 1Cum fill the
1.57Cum(for 20mm size Jally)
So For the Ratio = 1: 2: 4 (Total = 1+2+4=8)
( there for 1 - Cement,2- sand,3- 20mm Size Jelly)
Calculate for Cement = 1/8 = 0.125
= 0.125 x 1.57
= 0.196
For Common 1Cum Cement Quantity = 1440kg
there for = 1440 x 0.196
Required Cement = 282kg
Calculate for Sand = 2/8 = 0.25
= 0.25x 1.57=0.393Cum
= 0.393 x 35.32
Required Sand =14 Cft
Calculate For Jelly = 4/8 = 0.5
= 0.5 x 1.57
= 0.79Cum
Required Jally = 0.79 x 35.32 = 28 cft

Is This Answer Correct ?    24 Yes 33 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what are the layers of the national and heir aprox thickness??

2081


what is the procedure of wet seiving. n percentage of silt in different type of soil?

2591


Define What is the best type of wood glue?

1082


what is the coefficient for running feet to cft coversion both area and price

2338


What was asked in isro civil interview

1059


Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?

1823


resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil

2628


Explain what is the difference between built area and super built up area?

1138


Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting

1749


how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .

2684


Explain how you can turn off the display for dimension in CAD?

1101


How do you convert wind speed into force?

1250


What is diversion tunnel in a dam?

1154


who to find building iron rod strenth

2107


Which ratio use for cement selery???

1856