hot water tank,top element 240v across,the bottom 120v
across,why?

Answer Posted / k.prakashchandra

So that it can be used for both 1 phase 120 V and 240 V systems.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

When semiconductor fuse does save thyristor in each cycle of conduction? Why under voltage setting keep less in SPRS and more in DC drive?

1640


WHY THE RATINGS OF THE TRANSFORMER IS 33KV WHY NOT OTHER???

1933


how to determine ct ratio in ht vcb?

1342


hi guys please tell me the procedure for mesuring the coil resistance of 3ph induction motor?

1437


How a capacitor discharge weld power supply works? what is the use of a pulse transformer?

1581






What is the most accurate way of testing ELCB?ELCB is better than RCD?

2882


what is class of SPD and dittels of all class ?

1581


what are the advantages and disadvantages of speed control of 3 phase induction motor by varying frequency explain with drawing

2180


what should be the no load current for 3 phase ac motors ranging from 5 kw to 1000kw?

1382


How can we design a HVAC Plant room which includes AHU,FCU,Chillers,Cooling towers, Pumps etc & how will they work? any Drawing if possible?

1879


in the case of 6.6kv motor starter combination contain fuses on it VCB. but in 11KV motor starter combination Fuses are not using in it's VCB why?

1826


What will be the output voltage of a transformer if it is primarily energized from a square wave voltage source?

682


How to do maintenance of transformer feeder.

1351


What current position are you holding in your current company?

1622


Dear all: Recently we got a question about Interface between PMS and SAP-PM.once we got a update message from PMS.we should set the deletional flag for functional location in SAP system.Is there any FM or BAPI to use?There are only functional location create and change provided by SAP. Best regards!