Post New Answer View All Answers
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
pile load testing procedure
What is type failure of road surface? how to repair the failure of road surface?
What is the difference between one-way slab and two-way slab?
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
What is difference between limit state and working stress method? How it is applies in building structure.
For Wet Mix Mecadam design what is Optimum moisture content
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
residential projects,structural.
What is the use of extruded feature in solidsworks?
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?