Which one is the main bar in a square slab (2m x 2m)
Answer Posted / adinarayana.g
Bars placed at bottom row is main bar and bars placed at top
row perpendicular to bottom bar is distributor bar
| Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
how to nfind out the specific gravity of sand.aggregate,water please help...
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
What does a construction cost covers and what does not?
what is mc arther pile?
What is difference between engineering stress and true stress?
in 100 cft = 1350 bricks in 100 cft = ? bloks
If specific gravity of cement is less than 3.15 what is the cause?
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
Why reinforcement done in shorter span in two way slabs
How much cement will require for 1Rmt Skirting laying
What is the biggest dam in america?
How much of the strength of concrete comes from post- production curing?