Which one is the main bar in a square slab (2m x 2m)
Answer Posted / adinarayana.g
Bars placed at bottom row is main bar and bars placed at top
row perpendicular to bottom bar is distributor bar
Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
What is thumb rule for deep trench excavation
For the construction project what capital cost has to be taken in consideration?
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
what is idealized curve for concrere and steel
Basic questions of civil engineering
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
What is the use of offset command?
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
what pressure the NP2 class RCC pipe can sustain?
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6