Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What are causes of cracks in outside plaster of a building
and how we prevent it during constructions?

Answer Posted / aditya richie

being an exothermic reaction heat is released, for reaction
to continue properly curing is extremely nesessary . cracks
occur due to lack of or inadequate curing. curing for 28
days is necessary.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What does a construction cost covers and what does not?

1193


What is different between DI Pipe and CI pipe?

2140


can stub column take the load as main column

1904


can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...

2109


Pls help me to arrive the rates for centering shuttering for highbay using H-frames?

2351


What is the difference between Grade I, II and III of GSB?

2639


how to calculate the density for high density concrete ? or is it same as the density of RC?

2404


Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.

1768


Which are the Steel tests ?

1225


pile load testing procedure

2216


what is civil engineer greatest strength and weakness?

13885


What are the methods of measurement? Describe it shortly

2242


suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?

2046


what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982

2050


we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level

2620