Bitumen grades are 30-40,60-70, 80-100. what is mean by 30-
40
Answer Posted / aditya richie
30-40 means bitumen having penetration between 30-40 mm .
The test done is called bituminous penetration test ,
machine used is vicats apparatus.
Is This Answer Correct ? | 26 Yes | 29 No |
Post New Answer View All Answers
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
what is the method used for marking of cantilevers in hirise buildings by using theodolite
how to preaper for interview wat they asked in interview give me idea
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
what is the permanent solution applied for restoration of leaning tower of pisa?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
How do we test on design and style in a software?
(Project Management Topic) What are the important criteria in the successful realization of the project?
what is the construction cost for per cft of multistorryed building in kolkata?
What is meaning of tlc
how to create our resume?
what is that one cub metre plaster in cemant and fine sand
What are the responsibilities of a construction manager?
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??