Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the difference between LT & HT Motors

Answer Posted / vijay singh

LT motor work on 440 volt
HT motor work on 3.3 kv or more

Is This Answer Correct ?    144 Yes 25 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Sir, I have applied for the of Assistant.engineer of NPDCL. please send me all AP TRANSCO AND JENCO solved papers of previous exams . I requested send me the papers to my id as soon as possible (rajanikanth_peddi@yahoo.co.in) (This is very urgent) Thank You,

2902


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1778


Sir, My doubt on cable sizing calculation, Load:74 KW calculated cable 1 run 50mm2. Now client asking us to reduce cable size by increasing runs. Sir, My question now when my mind strikes with 2 options 1) Divide load 74/2 = 36 and calculate cable for 36+36 making it 2 runs or 2) Simply i can divide 50mm2 /2 ie. 2 runs of 25mm2 Please suggest me sir

1931


explain different types of d.c motors?

1141


What is the function of attenuator in cro?

1190


What is the difference between Encoder and Resolver?

3519


How relay coordination has to be done? what are the inputs are required for this? Please explain this with calculation method?

1799


why did youi choose this career?

2214


Explain the purpose of inductor in an electric circuit?

1129


Pls mail me utility & Dg related question with answer

1781


how to measure dc earth leakage current?

3164


by what factor the starting current is used when comparing star and delta connection for motor starting?

2064


Is there any standard guidelines/Criteria to design NGR/NGT.?

2836


what is the value of combined earthing in general electrical circiut?

1902


Batteries. What is the difference between Lead and Nickel batteries ?

2200