Answer Posted / manish
corona loss p
= .00241[(f+25)/$]*[root of (r/d)]*square of[Vp-Vo]
f= supply frequency
$= air density correction factor
Vp = operating voltage
Vo= critical disprutive voltage
r= radius of conductor
d= distance of separation for fine weather
now for dc f=0 then a certain power loss by corona but less then ac corona loss.
Is This Answer Correct ? | 8 Yes | 2 No |
Post New Answer View All Answers
what are the available sizes of pin type terminal lugs in the market today?
What is the need of generator relay panel
During underground cabling in landscape area what did we cover the cable with to prevent the electric shock & protect the cable?
Is a contactor (or master relay) required between incoming lines and a VFD? The question goes to safety. If a contactor were used before the VFD and an e-stop engaged then the motor will coast to a stop (i.e. VFD loses power) instead of stopping much faster if the VFD braking fucntion were used. It would make more sense to keep power on the VFD.
What are the types of the glands and difference between single and double compression type of cable Glands.
When lag/lead/lag-lead compensation is employed?
How much of the total hydro power potential has been exploited so far in india?
We normally make oil soak pits under Transformers. Oil from soak pit goes to collection pit. We provide granules/pebbles under transformers. My question is weather granules/ pebbles to be filled in soak pit or not? if yes upto what level?
What is the difference between Static and servo controlled voltage stablizer?
What is milivolt dop test in Busducts? What is its significance & procedure to do the test?
How select ELCB for 32amp. socket having quantity 12Nos. We have to do this wiring in PLANT. Please Also explain the incoming cable specification.
What is d main advantage of using double circuit 3 phase transmission ?
Please send 110 kv sb station full single line drawing(sld)
while doing high voltage test on 11kv/433 distribution transformer why we only give 28 kv on hv side and 3kv on lv side for power transformers what is the value what factors it depends
Brief me about maintenance planning & sheduling of machine tool.