how material can be calculate for brick work in 1:6
Answer Posted / bhushan parate
ONE PART OF CEMENT OR LIME & SIX PART OF FINE AGGREGATE.
| Is This Answer Correct ? | 6 Yes | 21 No |
Post New Answer View All Answers
What is a hatch patterns?
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
why is the column design?
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
What is Grid floor and mention its advantages ?
What year was the keystone power plant in Indiana County constructed?
will fix foundation bolts at site with out template is there any procedure?
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
at which depth the construction of tunnel is economical from cost and engineering aspect.
what are the values of compressieve strenght?
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
how much of the strength comes from post-production curing
how to prepare site mix design