Answer Posted / syed ali raza naqvi
the disadvantages of a leading power factor that the to
much current passes and meter running fast n bill is
increase.
| Is This Answer Correct ? | 1 Yes | 10 No |
Post New Answer View All Answers
How many capacitors using in LT panel as per Govt rules?
why r we using shell transformer for low voltage
i have install 750 kva distribution transformer at my site and want to do neutral earthing. what calculations should i follow to determine earthing conductor material and size?
Basic motor transformer generator
What is electrical grounding?
# 4 hi friends i m from electrical branch and seeking for tech. + apti. both papers of hpcl plz get it available as soon as possible my email id is sumit_lig189@yahoo.co.in
If any cable burnt how can we identify it burnt by high current of high voltage?
what is dc mator?types of dc motor?losses in dc motor?what is the mechanical,electrical and commercial efficiency of a dc motor?
Different types of relay fault which phase sequence??
1. The DC generaror,s induced output emf is connected with a DC motor(as load). when increasing the load of the motor by using brake drum or any way. what are the parameters will changes in both motor and generator(voltage, current, resistance, frequency, speed, torque, power, flux etc...) 2. Similarly for AC generator and AC motor 3. similarly if using DC batteries instead of DC generator, What happens?
What is the voltage gain or transfer function of amplifier?
my name is venkat .i have good percentage in my academics(ssc 86, intermediate 83 b.tech 73) my question 1..after completion of my ssc i joined in bpc but i didnt got rank in emcet so i completed MPC in one year compartmentally ..so here what am expect question from this background?
what id a dry type transformers and its function ?
sir,in our plant we r using SATEC PM172E power reading meeters in HT panel side it is monitoring the MB data smart viewer(sever).but last one week we did not get readings inthe server only available in meeter.tell me how communicate meter and server. and also what steps we take for checking.
what you have to see after one week or month from the day of installation of transformer ?