Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How do we calculate the building footing calculation ?

Answer Posted / srinivasan

1) FOR RECTANGULAR OR SQURE PORTION L X B X H WHERE L=
LENGTH B= BREADTH, H= HEIGHT

2) TRAPEZOIDAL PORTION H/3 (A1+ A2)+SQRT (A1*A2)

Is This Answer Correct ?    9 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?

1658


A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S

1995


If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?

2165


For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)

2049


what pressure the NP2 class RCC pipe can sustain?

2702


List out some of the software program that can be useful for architect?

1104


Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.

2510


What is meant by engineering drawing?

1052


how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.

2069


what is the formula to find the diagonal shape stirrups?

1901


how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

2460


what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..

2498


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

2129


During reclamation how can the occurrence of mud waves can be rectified?

1295


pls tell me , what is the water content

2206