why compression strenth of concrete is tested with a cube of
size 150x150x150 mm ?
Answer Posted / souagata bangal
In 150x150x150mm cube the dimension 150mm is match with the pressure plate dimension.If it is less than 150mm the total pressure distribution is not as per spesification and it will show more than the cube value.If the dimension is grater than 150 mm ,the pressure distribution will not to the whole surface of the cube.
| Is This Answer Correct ? | 27 Yes | 5 No |
Post New Answer View All Answers
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
The portion of a brick cut across the width is called?
Explain creep?
Explain what is the release of lien?
What is the meaning of a blue land surveyors flag?
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
how many time use of plywood shuttering and IS code
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
115mm thickness brick work how to required mortar
How to arrive d*d/162 , for finding the kg per meter , wt of steel
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
Prepare a Schedule for a Highrised building from starting stage to Handover?
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m