Q:What is the formula of bar to bent the slab in bent slab?
Second question Q: what is formula to calculate the hook?
Answer Posted / dhaval dhanani
l/5 continuous slab The bent up for end slab is L/7. For
hooks it is 7x dia for each hook
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
How can explode a block?
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
What is the diameter of the 3"inch nails?
Which tests are performed on soil to decide the type of foundation to be provided.
How to make tiles floor step by step procedure?
PL.tell me about civil engineering questions with answer
In block work seawalls what is the purpose of slip joints?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
What does civil engineering mean?
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
for pretensioning which will yield first and same for post tensioning?
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
insted of bentonite we can use any alternate material in piling ?
it is a corrected question." make a list of engineering property(properties) of soil.