Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is mean by process control?

Answer Posted / c.r.r.nair

Process control can be described as the method of keeping the process within the specified boundaries controlling and monitoring the variations to the least minimum to achieve the optimum quality product.

Is This Answer Correct ?    10 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why are the uses 24vdc in industries

945


in sulfur process what is material of impulse line we use to connect with transmitter ? and does teflon affected by sulfur?

2217


control panel design guidelines

3328


Why we are using DPT(Differential Pressure Transmitter) in separator instead of level trasmitter?

2194


Draw a group of instruments interlocked to a Pump & Motor?

1230


this site is owned by an nonsense

2248


WHAT IS THE DIFF. BETWEEN SKIN TEMPERATURE AND PASSES TEMPERATURE..?

2478


Which is the best field foundation bus. ( FF ) Yokogawa, Honeywell or others ?

1747


what step is taken for ESD ( emergency shut down) in DCS REPLY to hashimka20009@gmail.com

2265


draw shematic diagram of c/v positioner(smart type)?

2166


Boolean algebra

2118


A DP transmitter is used to measure the level of an open tank. The drain line of the tank is connected to a control valve, and is configured as, if the level of the tank is 90% the valve should get open 10%. And if the tank level is 10%, the valve should get open 90%. Draw wiring diagram and explain how to configure DP transmitter and control valve using HART communicator. If the span error at output is 1%, what will be the %opening of the control valve at 60% level of the tank?

1340


I have completed B.E. Instrumentation & control in 2009. i have 3 year industrial job experience in chemical plant.now, I want to join M.E. in external. so, Plese say easiet way and good institute name.

1861


In turbine what does term CDP, NH, HSSOC means.

1714


What care will you take in the installation of control valves,SCADA,DCS and FOC in Oil and Gas Project?

2060