what is the allowable silt % in river sand for Dam
concreting.
Answer Posted / sjtbehera
it is 3%
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
How to find permissible diagonal tensile stress in reinforced brick work
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
how to create our resume?
Define mirror?
How to calculate steel for beam slab and column
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent
which has high compressive strength between hollow block and brick masonry?
What is meant by solid geometry?
What is factor not to be taken in consideration in mix design?
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
How to arrive dry volume of concrete (1.52 to 1.57) ?
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?