If a 12m main road straight is adjoined from both sides by
7.5 m road , how curves are given at corner for vehicle
movement (measurement pls.)?
Answer Posted / anonymous
the answer though quite npt predictable but we can assume it
to be as follows
since the middle road is of width 12m and adjoining is of
7.5 m each , so extra widening in middle road is not
required depending on the design velocity.
so the extra widening required will be in the other two
adjoining roads wgich may be taken as 0.5 m for both the
roads as width is already 7.5 m..
further depending on the ruling radius and design velocity
it may be summarized that no such extra widening is reqd.
where the deign velocity should be limited to 60 km/hr
depending on terrain
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
how much percent are used 20mm,10mm?
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
what are the five benefits of using standard terminology in the measurement process?
What is GSB gradation
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
how much of the strength comes from post-production curing
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
For fine aggregate which is most suitable River sand or crusher sand & why ?
what else we can add rather than admixture in concrete to reduce the cement quantity?
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
what is civil engineer greatest strength and weakness?
what is flashing?