we are small scale industry in production of rice & rice
bran. Pls let me know how to take contract demand for our
industry.. (for information we have total 600.hp)
Answer Posted / sumeet
First of all please estimate your mill load, office load
(lighting load and air conditioner load).
As per you have shown 600 hp load your contract demand will
be 447.6 kW i.e 527 KVA considering 0.85 power factor
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to convert 2 phase to 3 phase electricpower in induction moter?
What is meant by full pitched winding?
Can anyone please give me the parameters , formula needed to calculate the circuit breakers for building services.Thanks
how is the incoming cable size calculated for a given current rating of a panel??
what is RNG in the DG synchronizing by PLC?
explain PV modules in solar energy generation.
write down the formula of cable size in RM if current is 50Amp.
what kvrah y we need to take the readind of that
What is the most important precaution in any experiment with d.c. Shunt motor?
what is inverter and converter
1. Can a 12v DC choke operate a 60v/12w PL lamp ? 2. Can a 230v ballast fire / operate a 60v/12w PL lamps.
what is mind in cable
What is the difference between rated and per unit in transformer?
Can any body tell me about INNER SHUNT COMPOUND MOTOR diagram?
How to detect voltage vector shifting in interconnection protection.