Answer Posted / anirban mondal
wATER ABSORPTION IS CALCULATED BY THIS FORMULLAE
[{(W2 -W1)/W2}/100] = ?? %
Where, W1 = Dry weight of Sample
W2 = Weight after 24 hrs in water.
| Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
Explain what is alternate bid?
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
What Reinforcements Are Used In The Process Of Prestressing?
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
The definition of national highway
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand